EN 1888-2 CERTIFIED · GPSR TECHNICAL FILE INCLUDED ENDEFRES

Own factory + managed partner network

Baby strollers that clear EU safety review the first time.

We build strollers in our own plant and work with a vetted partner network for models we do not tool ourselves. You get the product and the paperwork — EN 1888-2 and a complete GPSR technical file with your EU responsible person named.

Drawings and specs you send stay confidential. NDA signed before sampling.

Flagship cabin-size baby stroller, three-quarter studio view

One partner, two ways of working

Most suppliers are either a factory with one product line, or a trader with no plant. We tell you plainly which mode applies to every item you order.

WE MANUFACTURE

Strollers, prams and travel systems

Our own plant: tube processing, welding, powder coating, injection, sewing and final assembly under one roof, with an in-house lab for EN pre-testing.

  • Tube cutting, bending and jig welding in house
  • Powder coating and injection on the same site
  • EN pre-test before the sample goes to the accredited lab

WE MANAGE

Partner-built models and infant carriers

Models we do not tool ourselves, built by partner factories we audit, schedule and inspect. One contract, one QC standard, one consolidated container — and the factory that actually built each item named in its technical file, which is what GPSR asks for.

  • On-site IPQC during production, not just final inspection
  • Same documentation pack as our own-build items
  • Mixed-model container consolidation

Twelve models in current production

Full range with carton and loading figures

Carton sizes and loading quantities are taken from the current factory specification. Three models carry a condition on the standard — it is written on each of their pages.

Two markets, two standards. We build to both from the drawing.

See the documentation pack

EUROPEAN UNION

EN 1888-1:2018+A1:2022up to 15 kg
EN 1888-2up to 22 kg
EN 1466 · EN 13209-2carrycots · carriers
ECE R129 (i-Size)car seats
REACH / SVHCmaterials

UNITED STATES

ASTM F833-21strollers
16 CFR 1227CPSC mandatory
CPSIA · CPClead · phthalates
FMVSS 213car seats
CA Prop 65labelling

GPSR — SINCE 13 DEC 2024

No EU responsible person, no listing.

Regulation (EU) 2023/988 requires an economic operator established in the Union before a product can be placed on the EU market — and marketplaces now delist stock that has none. We supply the technical file and risk assessment behind it, and work with your importer, authorised representative or fulfilment provider so the name on the label is one that holds up.

Come and audit it. Or watch the line first.

Factory tour
Incoming material store, with the fabric and tube racking
Sewing floor, with stroller assembly on the right
Qualified goods area, released stock staged for packing
Packing bay, cartons palletised for container loading

Photographs taken on the floor, not a stock library. Ask for a live video walk-through of any station.

Own lab, not a rented one

Rolling-road, brake, stability and harness pull rigs on site. Failures surface at sample stage, not at the third-party lab.

AQL 2.5 / 4.0 inspection

IPQC at three checkpoints plus pre-shipment inspection. Report with photos before the container is sealed.

Audited to your scheme

Tell us which certificates your customer requires and we will send what we hold. We host your own auditor or a third party at any time.

Traceable batches

Date and batch code on every frame, so a recall touches the affected lot only — a GPSR expectation.

Seven steps, with the timeline written down

01
Brief & NDA
Target market, price band, standard.
2 days
02
Design & DFM
Drawings, materials, mould-flow review.
2–3 weeks
03
Tooling
Moulds cut, cost quoted openly.
4–6 weeks
04
Sample & lab
In-house pre-test, then accredited lab.
3–4 weeks
05
Pilot run
50 units, line balanced, packaging proofed.
1 week
06
Mass production
IPQC checkpoints, weekly photo update.
25–45 days
07
Docs & shipment
Full file, export papers, container sealed.
5 days

Durations above are typical for this category. The timings for your project are confirmed with the quotation.

A new model reaches your warehouse in about 5–6 months. An existing model with your branding, in about 45 days.

What importers ask us most

All guides

Send us a drawing, a competitor link, or just a target price.

A quote with tooling cost, MOQ and lead time comes back within one working day.

Request a quote Get the 2026 catalog (PDF)

Or reach us on WhatsApp / WeChat / LinkedIn